Standard Construction

New concrete construction

  • 4" Concrete Floor (1).
  • All Concrete is Steel Reinforced.
  • Crushed Stone Floor under Concrete.
  • High and Dry Water Ledge System to Prevent Seepage on All 4 Sides.
  • Anchor Bolts to Secure Garage to Floor (5).
  • Conduit Stub for Electric.
  • Pitched Floor for Water Drainage.
  • All Concrete 6 Bags Mix.
  • Score Joints on Concrete Floor.
  • All Concrete to Meet Local Buklding Codes.

New concrete construction

  • Wolmanized Bottom Plates With Seal Sealer (11).
  • 16" on Center Wall Studs (12).
  • Sway Bracing as Needed (13).
  • Double Wall Construction (14).
  • Steel pre-hung Service Door w/lock deadbolt (15).
  • Double 2x12 Laminated Header 1/2" Flitch Plate (16).
  • 7' High Door for Vans with Torsion Springs (17).
  • Choice of Slider or Jalousie Picture Window 24"x36".
  • Siding of Choice (19).
  • Aluminum Threshold (20).
  • Triple 2x4 at all Corners (21).
  • Finished Jams (22).

Roof construction

  • #235 25 Year Seal Tub Shingles Choice of Colors (23).
  • Finished Boxed Eaves (24).
  • 6"-12" Sealer Eaves (25).
  • 2x6 Crossties with Trusses Plus 1-2x6 tie Horizontally for Further Support.
  • 2 Roof Vents with Screens (27).
  • 2x8 Hip & Ridge.
  • 2x6 Bird Mouth cut Rafters (29).
  • #15 Felt Under Shingles (30).
  • Exterior Grade Sheating (31).



See how we work